Sidewalk Projects in District IV
Design phase:
· East Maxwell Lane – Highland to Sheridan (north side).
· Marilyn St., from Nancy St. to High St.
· 2nd Street (north side) – between High St. and College Mall Rd.
Completed:
· Queen’s Way from Sussex to High – constructed per 2006 Committee
To be constructed in 2007:
· Arden – From High to Windsor (south side).
· Nancy from Ruby to Mark St.
· Circle Dr., from Jordan to Mitchell (south side).
· Maxwell Ln. from Clifton to High St.
Sidepaths/Greenways:
· Nota Dr. to Maxwell Ln. (existing path to be redesigned and refurbished).
Southdowns to Greenwood.
Other:
· N. Side of Moore’s Pike – As part of the Renwick project, the developer made some off-site improvements on the sidewalk on the north side of Moore’s Pike (Winfield St.).